Hi Bruce,
I am studying the HotDates 12 example.
With the NetWebYear and NetWebMonth control I see that it's possible to drag and drop items.
But with the Planner control, this isn't possible?
It would be very very handy if you can drag and drop items in the Planner control.
Best regards
Jeffrey
-
that would be handy wouldn't it?
although I _suspect_ you might not have enough fine control to actually get it to the right exact time. I'm guessing it would need some sort of "snap-to" type feature.
cheers
Bruce
-
Yep, that would be very handy!
Because now you have to click on the item and change everything in the form.
Best regards
Jeffrey